100KW wood chips gasification power plant in Congo
Time:2016/06/13 Pageviews:
►100KW wood chips gasification power plant in Congo
►Installation time: 2014.3
►Project desription:
The electricity is shortage in Africa. The client has a factory which needs to use about 100KW electricity. So they decide to use wood
chips to generate electricity. They visited our factory and place order from us, they operate the system 24/7.
►Installation time: 2014.3
►Project desription:
The electricity is shortage in Africa. The client has a factory which needs to use about 100KW electricity. So they decide to use wood
chips to generate electricity. They visited our factory and place order from us, they operate the system 24/7.